Okano Construction (Head Office)
The new Okano Construction Head Office was built in wood. Taking the location into account, we designed it as a two-story structure with a space that overlooks the Kameoka Fireworks Festival. The first floor includes an office, a meeting area, water facilities, and a storage room, with parking provided for four vehicles.
| Construction Period | June 2022 ~ March 2023 |
| Details | Wooden Structure New Construction Works (Lump Sum) |
| Location | Kameoka-City, Kyoto Prefecture |
| Client | Okano Construction (Head Office) |
| Contractor | Sakaguchi Komuten |
| Design |
NMZ Co., Ltd.
|
