Okano Construction (Head Office)

The new Okano Construction Head Office was built in wood. Taking the location into account, we designed it as a two-story structure with a space that overlooks the Kameoka Fireworks Festival. The first floor includes an office, a meeting area, water facilities, and a storage room, with parking provided for four vehicles.

 

Construction Period June 2022 ~ March 2023
Details Wooden Structure New Construction Works (Lump Sum)
Location Kameoka-City, Kyoto Prefecture
Client Okano Construction (Head Office)
Contractor Sakaguchi Komuten
Design
NMZ Co., Ltd.